Milena — Izmir → Kobe

Varamar performed the shipment of dismantled factory for MITSUBISHI HITACHI POWER SYSTEMS. Project cargo (ducting parts in 22 packages; gross weight: 121.573,00 kg) was loaded in Turkey and safely discharged in Japan.

back to projects

View also
Vectis Isle — Bremen→ Karachi

TOTAL WEIGHT: 109,628.00 KGS TOTAL AREA: 156,220 CBM.
The transformer was produced by JST Transformateurs, manufacturer of electric transformers with more than 50 years...

view project
Vectis Isle — Antwerp → Mundra

TOTAL WEIGHT 5 526,074 MT



«The cargo (rails profile 60E1 of grade 880) was produced by British Steel’s factory in France. British Steel was created in 2016 when Greybull Capital bought the Long Products...

view project
Stellar Maestro — Derince → Duqm

VARAMAR performed shipment of equipment for the Duqm Refinery in Oman from Turkey. The cargo (67 packages, parts of heaters) was shipped in the framework of the Duqm Refinery project...

view project
Eemslift Ellen — Laem Chabang → Jorf Lasfar

TOTAL WEIGHT: 536.062,00 KGS

TOTAL AREA: 2741.470 CBM

The cargo (72 packages of machinery parts) was produced and shipped by Italy-based plantmaker Danieli, a full cycle provider from raw materials...

view project
Stellar Maestro — Marina di Carrara → Dammam

TOTAL WEIGHT: 108.490,00 KGS TOTAL AREA: 322,02 CBM
«The cargo (2 pieces: Centrifugal Compressor R90-K-0201B and auxiliary parts...»

view project
Ready to ship?

Our chartering managers speak many languages, including English, German, Arabic, Spanish, Chinese, Hindi, Italian, Russian, Ukrainian and Greek.

Contact us Get a quote